1ST FLOOR RESTORATION - DURING CONSTRUCTION
The condition of the structure was so poor that it had to be re-built from the inside before any remodeling could take place.  We started with the dirt floor crawl space.  Every Spring it would flood.  So, drain tile and sump pump had to be installed followed by a concrete floor.
Drain Tile & Sump Pump Vapor Barrier Concrete Pour
Signature Spaces Design Build Remodeling Erin Drain Tile, Sump Pump Crawl Space Vapor Barrier By Signature Spaces Design Build Remodeling Erin Erin Crawl Space Concrete Pour By Signature Spaces Design Build Remodeling



Structural issues included the installation of a major support beam to hold up the ceiling above the new kitchen. 

Propping Joists Beam Installed Props Removed
Installing Beam  In Erin By Signature Spaces Design Build Remodeling Signature Spaces Design Build Remodeling Beam Installation In Erin Signature Spaces Design Build Remodeling After Erin Beam Installation



After the re-build was completed it was time to frame the walls.  Note the extra "A-Frameing" that was required during the re-build,  The following 3 photos panning left to right show the street side of the home.