Search   Site Map   Home


COTTAGE RESTORATION - 2ND FLOOR

Before

Signature Spaces Design Build Remodeling 2nd Floor Erin Cottage Restoration



During
We didn't have to re-build the 2nd floor but, structural modifications were required in order to complete a full-sized bedroom, lounge and storage areas.

Framing

Signature Spaces Design Build Remodeling Framing 2nd Floor Erin Cottage Framing Erin Restoration By Signature Spaces Design Build Remodeling 2nd Story Framing By Signnature Spaces Design Build Remodeling Erin Cottage Erin Cottage By Signature Spaces Design Build Remodeling 2nd Story Framing



Insulation

All of the old fiberglas insulation was removed and CoreBond foam spray was applied for a very tight and quiet environment no matter what season.
Bedroom/Stairwell Bedboom/Storage Area Stairwell
Corbond Spray Foam Insulation Used By Signature Spaces Design Build Remodeling Erin Cottage by Signature Spaces Design Build Remodeling Corbond Spray foam Spray Foam By Corbond In Signature Spaces Remodeling Erin Cottage


Now go upstairs to view the Signatures Spaces that capped this award-winning project.


2nd Floor After Return to 1st Floor Return to Portfolio